DOCUMENTS & COMPLIANCE

Documents & Compliance

Know the required file set before the order starts. It is confirmed against the exact product, source, destination and project, then tied to the agreed inspection, packing and shipment stages.

01 / ORDER FILE SET

Organize the order file around four buyer decisions.

File groupWhat it should clarifyConfirmation point
Product & ConfigurationItem, model, interface, critical dimensions, quantity and revisionBefore quotation or order confirmation
Inspection & ReleaseCheckpoints, method, coverage, acceptance basis, result and responsible partyBefore production or source commitment
Packing & ShipmentProtection, package identity, marks, packing list, invoice and destination documentsBefore packing and shipment booking
Product / Project ComplianceNamed issuer, holder, scope, validity and exact product or destination coverageBefore quotation or production

If third-party inspection is required, confirm the inspector, scope, timing, hold points, report and disposition authority before production.

02 / PRODUCT-SPECIFIC FILES

The file set follows the product—not a generic certificate list.

Product familyConfirm before orderOrder outputs to agree
Pneumatic EquipmentModel/configuration, shank, air/water connections and functional-check requirementConfirmed specification; inspection or function record when agreed; packing list
Integral / Tapered / Top HammerSystem type, length, straightness, passage and end protectionSpecification or drawing; dimensional/interface record when agreed; packing list
DTHHammer, bit and pipe matching, shank or thread, diameter and air pathMatching sheet or specification; inspection record when agreed; packing list
Specialist / Project SupplyExact product and source, destination, service, compliance and third-party scopeNamed product or manufacturer files; project inspection report when contracted; shipping documents

03 / WHAT THE FILES SHOULD SHOW

The key fields should be clear before you request the file.

01SPECIFICATION CONFIRMATION
  • Order reference
  • Product / model
  • Interface
  • Critical dimension or configuration
  • Quantity & revision
  • Approval / date

Confirmed before production or source commitment

02INSPECTION RECORD
  • Order / batch identity
  • Checkpoint & method
  • Acceptance basis
  • Coverage
  • Result / status
  • Reviewer / date

Format and coverage agreed before production; closed before release

03PACKING & SHIPPING CHECKLIST
  • Package ID
  • Item / quantity
  • Protection & packing method
  • Shipping mark
  • Packing list / invoice
  • Release / date

Closed before dispatch

04 / SCOPE CHECK

A named document is useful only when it covers the exact requirement.

01

Issuer

Who issues the document?

02

Scope

Which entity, source, process, product family or model does it cover?

03

Validity

Are the issue date, expiry and revision current?

04

Coverage

Does it apply to this product, source and destination?

05 / CONFIRMATION PATH

Confirm the file package before the order is placed.

BUYER REQUIREMENTPRODUCT / SOURCE MATCHFILE AVAILABILITYSCOPE & FORMAT AGREEDLISTED IN ORDERDELIVERED AT AGREED STAGE

06 / PACKING & EXPORT

The file set should match the way the order ships.

Confirm packing scope, package identity, shipping marks, packing list, invoice and any named destination document before shipment booking.

Long drilling products protected and prepared for packing

Order Protection & Packing Check

Boxed equipment transferred at the dispatch stage

Packing Handover & Shipment Files

07 / DOCUMENT REQUIREMENT

Tell us exactly what your destination or project requires.

Send the product, model or interface, destination and the exact certificate, inspection record, file format or third-party requirement. We will confirm availability and scope before quotation.